Gallery Image
Gallery Image
Gallery Image
Gallery Image
Gallery Image
Gallery Image
Gallery Image
Thumbnail Image
Thumbnail Image
Thumbnail Image
Thumbnail Image
Thumbnail Image
Thumbnail Image
Thumbnail Image
Sansara (Phase I)
Overview
  • Land Area : 17.4 Acre
  • Completion Date:31/10/2029
  • No. of Tower : 5
  • Open Space : 70%
  • Height of Tower : G + 40
  • No. of Apartments : 413
  • Property Status:Under Construction
  • Rera No. : WBRERA/P/HOW/2024/001857
Location
Sansara (Phase I) - Sansara, Salkia School Road, Golabari, Howrah, West Bengal, India
Educational Institution Icon
Education Institution
  • Lakshmipat Singhania Academy9.9 KM
  • La Martiniere For Boys/ Girls7.6 KM
Hospital Icon
Hospital
  • ILS Hospital, Howrah1 KM
  • Belle Vue Clinic7.1 KM
Location Icon
Hotspot
  • Park Street5.7 KM
  • Quest Mall7.8 KM
  • The Calcutta Swimming Club4.2 KM
  • The Saturday Club6.9 KM
Amenities
Badminton Court

Yoga Lawn

Badminton Court

Observation Deck With Seating

Badminton Court

Open Lawn

Badminton Court

Rock Climbing

Badminton Court

Reflexology Walkway

Badminton Court

Cabana

Badminton Court

Floating Deck

Badminton Court

Astronomical Deck

Badminton Court

Walk Trail

Badminton Court

Outdoor Gym

Badminton Court

Kids Pool

Badminton Court

Natural Waterbody

Badminton Court

Indoor Kids Room

Badminton Court

Park

Badminton Court

Amphitheatre

Badminton Court

Senior Citizen Sitting Area

Badminton Court

Lounge

Badminton Court

Jogging Track

Badminton Court

Kids Play Area

Badminton Court

Yoga Room

Badminton Court

Water Features

Badminton Court

Nature Trails

Badminton Court

Multi Purpose Court

Badminton Court

Library

Badminton Court

Garden

Badminton Court

Gymnasium

Badminton Court

Cycling Track

Badminton Court

Cards Room

Badminton Court

Cafeteria

Specification

Bedroom

  • Flooring: Bare finish for all habitable spaces
  • Walls: Putty
  • Doors: Bare finish for all habitable spaces
  • Window: Aluminium windows
  • Electrical: Tap off points/ conduiting with DB installed & modular boxes installed

Living Room

  • Flooring: Bare finish for all habitable spaces
  • Walls: Putty
  • Doors: Main door will be provided
  • Windows: Aluminium windows
  • Electrical: Tap off points/ conduiting with DB installed & modular boxes installed

Kitchen

  • Flooring: Bare finish
  • Dado: Bare finish
  • Counter: Bare finish
  • Sink: Bare finish
  • Electrical: Tap off points/ conduiting with DB installed & modular boxes installed

Toilet

  • Flooring: Anti-skid tiles
  • Walls: Tiles up to false ceiling
  • Sanitary ware: Will be provided
  • C.P fittings: Will be provided
  • Electrical: Tap off points/ conduiting with DB installed & modular boxes installed
Floor Plans
Price
3 BHK

2515 sq.ft (Super Built Up)

Price: 3.11 Cr.

3 BHK

2580 sq.ft. (Super Built Up)

Price: 3.50 Cr.

4 BHK

3272 sq.ft. (Super Built Up)

Price: 3.96 Cr.

4 BHK

3364 sq.ft. (Super Built Up)

Price: 4.49 Cr.

5 BHK

4885 sq.ft. (Super Built Up)

Price: 6.17 Cr.

Note: Price includes flat cost + extra charges.

N.B.: All are including 2 covered independent car parking.